New stadium could be built by 2017
It is hoped that the development, costing in the region of £43 million, could also see the return of the Milk Cup finals to Coleraine.
Described by Council as a ‘signature project’ the facility could boast a Leisure Centre, six-lane swimming pool, a learning pool, health suite, gym, studios, a main hall incorporating eight courts and an indoor soft play area.
Advertisement
Hide AdAdvertisement
Hide AdOutdoor facilities planned for the site include a stadium pitch, which has been designed in conjuctione with Coleraine Football Club, a 4G multi use pitch, two 3G pitches, a synthetic hockey pitch, caged five-a-side and seven-a-side football facilities, a play area and commercial units.
What are your thoughts on the project?
*FOR FULL REPORT SEE TUESDAY’S COLERAINE TIMES